Supply and Installation of Tanks and Liquid Storage Units

ANGLIAN WATER SERVICES LIMITEDcontractFind a TenderRef ocds-h6vhtk-0514c7Procurement Act 2023Utilities regimeSME suitablepending
View buyer

Estimated value

Awarded value

Awarded 10 Dec 2025

Suppliers

13

12 SME

Lots

6

6 awarded

Published

11 Dec 2025

Description

This procurement covers supply and installation of all liquid storage applications including gravity storage/process tanks, silos, pressure vessels, including chemical storage and underground storage. Where relevant, Reg 31, PER (Pressure Equipment Regulations) / PSSR (Pressure Systems Safety Regulations) and DSEAR (Dangerous Substances and Explosive Atmosphere Regulations) regulations shall be followed. Tanks shall be manufactured to relevant UK industry standards and comply with Anglian Water asset standards and AW amended WIMES and CESWI. Covers and roofs shall be supplied where requested and, where required, all covers and roofs shall be fully self-supported by the tank. Permanent Access Fabrications (PAFs), including stairways and platforms - access stairways and platforms shall be fully self-supported by the tank Testing - tanks shall be fully water-tested and where a working pressure is specified (above ambient) the tank shall be pressure tested in accordance with UK industry standards and AW asset standards. In the event of a defect or failure during the warranty period of 1 years, the supplier will be expected to repair or replace the product within one working week from the date on which they are notified regarding product failure. The supplier will be expected to provide temporary assets for the period required to maintain operations that were undertaken by the product whilst repair or replacement is being undertaken. Installation - tanks shall be delivered to site, off-loaded and installed by the supplier and meet all relevant Anglian Water requirements for safe working. Install of sectional tanks to be done by supplier, install of Pre-Cast Concrete tanks to be done by @one with supplier supervision. Supplier to detail the craneage requirements for off-loading and erection; craneage may be provided by supplier, AW or its Alliances. Compatibility - tanks must be fully compatible for the application and contents that they are intended to be used for. Design life and maintenance / inspection - Suppliers shall specify the design life of the tanks and ancillaries under the anticipated conditions and shall identify any maintenance requirements necessary to meet the specified design life. The design life is to achieve at least the minimum life stated in any applicable standards, where there is a conflict, the maximum life is to be achieved. Ancillaries and openings - tanks shall be supplied with manholes, connections and ancillaries as detailed in the tank data sheet. All process equipment (including launders, baffle boards) flanges, sockets and bolts shall be compatible with the fluids, interfacing materials and application of the tank. Bunds - where integral bunds are required, these shall meet the same design standards and design life as the tank. Design - the tank shall be designed to withstand dead loads, internal pressure, ground pressure load, wind and snow loadings, thermal effects, imposed roof load, loads due to equipment and fixtures. Coatings - any coatings used shall be compatible with the fluids and application for which the tank is designed and meet the design life specified.

Scope

Reference
PA 2024 1140
Commercial tool
Standalone contract
Contract dates
28 Sept 2025 to 28 Aug 2030
CPV classifications
44611400
Contract locations
Yorkshire and the Humber, United Kingdom
East of England, United Kingdom
Particular suitability
Small and medium-sized enterprises (SME)

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Qualitative QuestionnaireFull breakdown of questionnaire provided in the tender documentationquality65.00%
Pricecost35.00%

Submission & procedure

Procedure
Competitive flexible procedure

Award details· 6 awards

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

10 Dec 2025

Contract start

15 Jan 2026

Contract end

14 Jan 2029

Awarded to
HG
SME
TC
SME
FT
SME
FT
SME
AL
SME
FT
SME
TC
SME
BP
SME
HG
SME

Lots · 6 total

Divisions of the contract. Each lot can be awarded separately.

View all →
LotTitleEst. valueStatus
1Glass Fused to Steel Tanks£53.0mcomplete
2Glass Reinforced Plastic Tanks£53.0mcomplete
3Plastics Including PVC Tanks£53.0mcomplete
4Polyethylene Tanks£53.0mcomplete
5Pre-Cast Concrete Tanks£53.0mcomplete