Cl172/0/1 C10 Overhaul Job - Brake Raft Overhaul
Estimated value
—
Awarded value
£619k
Suppliers
1
Lots
1
Published
30 Jul 2026
Description
The C10 Overhaul Heavy Maintenance programme is due in 2026 to be performed on the Angel Class 172/0/1 fleet currently on a dry lease with WM Trains. As such, heavy maintenance arrangements are the responsibility of WM Trains and some of the jobs within the C10 specification WMT/172/HM Issue:1 require specialist external supplier support. An agreement with Wabtec for the Brake Raft Overhaul (job BR 0007) element of the C10 overhaul of Class 172/0/1 is required as WM Trains do not have the relevant IP to perform this.
Scope
- Reference
- 3779
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Direct award
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£619k
Award date
29 Jul 2026
Contract start
11 Aug 2026
Contract end
11 Aug 2027
Awarded suppliers· 1 supplier
Awarded 29 Jul 2026 · Contract period 11 Aug 2026 — 11 Aug 2027
Other contracts from WM Trains Ltd
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to WABTEC UK LIMITED· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| MK4 Float Bogie Overhaul | contract | — | 31 Jul 2026 |
| Cl172/0/1 C10 Overhaul Job - Brake Raft Overhaul | contract | — | 30 Jul 2026 |
| Mk4 Wheelset Overhaul Contract | contract | — | 26 Jun 2026 |
| Mk4 Wheelset Overhaul Programme | contract | — | 17 Jun 2026 |
| Contract Award Notice for Wabtec Group Trams Brake Caliper Overhaul | contract | — | 09 Jun 2026 |
| Bombardier Trams Brake Caliper Overhaul, London Trams Rolling Stock | contract | — | 09 Jun 2026 |
| Materials and Services Supplies to London Underground Pan Fleet Rolling Stock & Engineering Vehicles | contract | — | 04 Jun 2026 |
| ScotRail Trains Ltd installation of DVRS braking system | contract | — | 29 Apr 2026 |
| Direct Award - Wabtec Components for London Underground Fleet | contract | — | 02 Apr 2026 |
| 465 TBOX Heavy Components Overhaul | contract | — | 31 Mar 2026 |