Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day Operatives; Drainage Work - Excavations; Drainage Work - High Pressure Jetting
Estimated value
—
Awarded value
—
Suppliers
9
Lots
3
Published
24 Apr 2025
Description
Blackpool Council is looking to appoint 3 ranked contractors on a framework (per lot) to supply skilled and trained operatives on a flexible and temporary basis to support the existing in-house team to deliver various works across the town. • Lot 1 Highways Day to Day Operatives – General maintenance of Highways and Public Realm. • Lot 2 Drainage Works – Excavation. Repairs to the Council’s drainage infrastructure, collapsed sewers, gully replacement and all other associated maintenance of the Council’s drainage assets. • Lot 3 Drainage works - High Pressure Jetting, de-silting, CCTV investigations, root cutting of the Councils drainage assets up to 1,200mm diameter This contract covers day shifts for highways day to day maintenance. Overtime and weekend working may be a requirement. The framework will operate between 1st April 2025 and 31st March 2027 with an option to extend for 1 year plus a further 1 year.
Scope
- Reference
- DN755706
- Commercial tool
- Standalone contract
- Contract dates
The framework will operate between 1st April 2025 and 31st March 2027 with an option to extend for 1 year plus a further 1 year (possible 48 month duration in total).
- Main category
- services
- CPV classifications
- 5000000050230000
- Contract locations
- North West England
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 30 | quality | — |
| Social Value | 20 | quality | — |
| — | 50 | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details· 9 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 3 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day Operatives | — | cancelled |
| 2 | Provision of Flexible & Temporary Workforce Drainage Work - Excavations | — | cancelled |
| 3 | Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting | — | cancelled |
Award 1· 1 supplier
Awarded —
Award 2· 1 supplier
Awarded —
Award 3· 1 supplier
Awarded —
Award 4· 1 supplier
Awarded —
Award 5· 1 supplier
Awarded —
Award 6· 1 supplier
Awarded —
Award 7· 1 supplier
Awarded —
Award 8· 1 supplier
Awarded —
Award 9· 1 supplier
Awarded —
Total lots
3
Awarded
3
Estimated total
—
Awarded total
—
Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day Operatives
Start
—
End
—
Estimated
—
CPV
Provision of Flexible & Temporary Workforce Drainage Work - Excavations
Start
—
End
—
Estimated
—
CPV
Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting
Start
—
End
—
Estimated
—
CPV
Other contracts from Blackpool Council
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to W. H. Tarmacadam limited· 4
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Flexible & Temporary Workforce - Highways Operatives 2021/23 | call off | £333k | 08 Feb 2021 |
| Flexible & Temporary Workforce - Highways Operatives 2021/23 | contract | — | 08 Feb 2021 |
| Flexible & Temporary Workforce - Highways Operatives 2018/19 | contract | £50k | 22 Mar 2018 |
| Provision of Flexible & Temporary Workforce Contract - Highways Operatives 2017/18 | contract | — | 21 Mar 2017 |