Contract For The Supply Only Of Pothole Repair Material
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
06 Feb 2026
Description
The City and County of Swansea operate a 48 hour pot hole repair project. This requires a proprietary product to be used out of hours in all condition. The Council recognise the advantage of a one stop fix and all repairs permanent first visit. This contract is for the supply of a Permanent Cold Lay Surfacing Material (PCSM) for use on the Highway and other public areas in Swansea. To be delivered to the Highways Deport in Players Industrial Estate Clydach Swansea. The materials are required to be HAPAS certified PCSM material usable in wet conditions. Products that require a dry surface will not be considered. Products that require a dry surface will not be considered. Material to be available in 25Kg bags in 6mm aggregate. Shelf life to be a minimum of 4 months.
Scope
- Reference
- CCS/24/243
- Commercial tool
- Standalone contract
- Contract dates
Contract Period: 1st June 2025 Until The 31st May 2026 (With The Option To Extend For Up To a Further 36 Months In 12 monthly Periods)
- Main category
- goods
- CPV classifications
- 44113000441138004411390044113700
- Contract locations
- Wales
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Lowest Price 90%, Quality 10% | 10 | quality | — |
| Lowest Price 90%, Quality 10% | 90 | cost | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—