Contract For The Supply Only Of Pothole Repair Material

View buyer

Estimated value

goods

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

06 Feb 2026

Description

The City and County of Swansea operate a 48 hour pot hole repair project. This requires a proprietary product to be used out of hours in all condition. The Council recognise the advantage of a one stop fix and all repairs permanent first visit. This contract is for the supply of a Permanent Cold Lay Surfacing Material (PCSM) for use on the Highway and other public areas in Swansea. To be delivered to the Highways Deport in Players Industrial Estate Clydach Swansea. The materials are required to be HAPAS certified PCSM material usable in wet conditions. Products that require a dry surface will not be considered. Products that require a dry surface will not be considered. Material to be available in 25Kg bags in 6mm aggregate. Shelf life to be a minimum of 4 months.

Scope

Reference
CCS/24/243
Commercial tool
Standalone contract
Contract dates

Contract Period: 1st June 2025 Until The 31st May 2026 (With The Option To Extend For Up To a Further 36 Months In 12 monthly Periods)

Main category
goods
CPV classifications
44113000
44113800
44113900
44113700
Contract locations
Wales

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Lowest Price 90%, Quality 10%10quality
Lowest Price 90%, Quality 10%90cost

Submission & procedure

Procedure
Open procedure

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to