GB-Shrewsbury: DMNH 016 - Shrewsbury Integrated Transport Package - Town Centre Package 1
Estimated value
£1.1m
Awarded value
£1.1m
Suppliers
1
Lots
1
Published
06 Sept 2018
Description
NOTE: This notice was updated on 06 September 2018 for the following reason: The award to P Casey (Land Reclamation) Ltd. on 21st April 2018 did not proceed. Shropshire Council awarded the above contract to McPhillips (Wellington) Ltd. on 30th July 2018 Period of Work Start date: 10/09/2018 Period of Work End date: 19/04/2019(This is an award notice for Principal Contractors for the next phase of the Shrewsbury Integrated Transport Package, which consists of Public Realm Enhancements located at three separate sites along Town Walls, Murivance and Claremont Bank corridor as follows: •Town Walls/Belmont at the Crescent Lane junction. •Town Walls and Murivance in the vicinity of Swan Hill and St John's Hill. •St Chad's Terrace and Claremont Bank At these sites kerbs will be realigned to provide wider footways and new pedestrian crossing points. The footways will be repaved with high-quality natural stone and other conservation grade paving materials. The existing drainage will be upgraded where required and is planned to include sustainable attenuation measures where possible. The existing street lighting will be upgraded. Carriageway resurfacing will also be undertaken. Some new street furniture is proposed. The traffic signs along the entire length of Town Walls/Murivance/St Chad's Terrace/Claremont Bank is to be upgraded where required, with the creation of a new restricted parking zone. This will also entail the removal of the existing parking restriction markings.)
Scope
- Reference
- BIP309040186
- Total value
- £1,100,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 20 Jun 2018 to 09 Nov 2018
- CPV classifications
- 45200000
Submission & procedure
- Submission deadline
- 21 Mar 2018, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.1m
Award date
21 Mar 2018
Contract start
20 Jun 2018
Contract end
09 Nov 2018