BBV HS2 MWCC North - Deep Drainage - Micro Tunnelling (WP/CM)
Estimated value
£1
Awarded value
£3.8m
Suppliers
1
Lots
1
Published
22 Dec 2022
Description
Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2. We are looking to engage with the supply chain whom provide Deep Drainage/ Micro Tunnelling works. This package of works includes two pipeline runs to be installed. The two pipes are different in diameter, one being 600mm & the other is a 1500 mm. The length of 1500 mm pipe featured is approximately 1190 metres. The peak depth of the install features at 11.90 metres BGL. A 600 mm pipe is also featured and this will also convey waters between the Marston Lane inlet, to an outlet planned at the rear of the Kingsbury Compound settlement pond. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Scope
- Reference
- C4A54714497
- Total value
- £1 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 27 Jul 2021 to 30 Mar 2022
- CPV classifications
- 43120000 43300000 43614000 45000000
Submission & procedure
- Submission deadline
- 08 Apr 2021, 1:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£3.8m
Award date
23 Nov 2021
Contract start
27 Jul 2021
Contract end
30 Mar 2022