Digarbon Contractor (PCSA)
Estimated value
—
Awarded value
£2.5m
Suppliers
1
Lots
1
Published
09 Feb 2026
Description
The appointment of a contractor to complete the retrofit of the Law (LAWPL) and Tower (PSYCH) buildings. Scope of works required at Law Building include: • Asbestos Removals. • Replacement of existing flat roof systems on both the main section of the building (including the lift motor/plant room) and the lower-level extension built in the 1990s. To facilitate these works roof top PV cells and MEP systems will need to be removed and re-installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the existing double glazed units on the ground floor of the 1990's courtyard extension). • FF&E - installation of new replacement windows blinds. Scope of works required at Tower Building included: • Asbestos removals. • Replacement of existing flat roof systems on the no.2 lower-level extensions only (not including the main roof which has recently been replaced). To facilitate these works roof top MEP systems will need to be removed and re-installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windows) and replacement with new double-glazed units and associated making good (except for the windows in the extension built in 2008 which are to be retained). • FF&E - installation of new replacement windows blinds. • Implementation of plans for phasing, sequencing and building user decanting to deliver the works. Stage 1 Appointment - The award of a NEC4 PCSA contract to 1 contractor following a competitive flexible procedure to 1 contractor (MAT)
Scope
- Reference
- CU.2012.JP
- Commercial tool
- Standalone contract
- Contract dates
- 16 Mar 2026 to 10 Dec 2027
- CPV classifications
- 45214400
- Contract locations
- Wales, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality and Responsible Procurement | — | quality | 70.00% |
| Price | — | cost | 30.00% |
Participation
Conditions suppliers must meet to bid.
As stated in the ITT Docs
As stated in the Conditions of Participation document
Submission & procedure
- Procedure
- Competitive flexible procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£2.5m
Award date
09 Feb 2026
Contract start
16 Mar 2026
Contract end
05 May 2026