Network Rail North West & Central Region CP7 Frameworks: Framework Category A

Network Rail Infrastructure LtdcontractFind a TenderRef ocds-h6vhtk-03b24732014L0025active
View buyer

Estimated value

works

Awarded value

Suppliers

4

Lots

2

4 awarded

Published

26 Mar 2024

Description

Network Rail has put in place a number of frameworks for Control Period 7 (CP7) for the delivery of capital works in the North West & Central Region. These frameworks are divided into categories and separate Contract Award Notices relate to each of them. This Contract Award Notice relates to Framework Category A. CP7 covers the 5 year period from 1st April 2024 to 31st March 2029. The Category A Frameworks cover the North West & Central Region which is formed of 3 routes, North West, Central and West Coast South. Framework Category A This category relates to the design and build of “large projects” and includes two separate lots for projects with a value of £7to £200m (Lot A1) and £7m to £50m (Lot A2). Both lots cover the full North West and Central Region. The scope of works and services proposed to be delivered under Framework Category A is multi-disciplinary across the following three disciplines: Civil Engineering, which includes but is not limited to; • Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects. Buildings, which includes but is not limited to; • works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations. Railway Engineering, which includes but is not limited to; • projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway. The scope of the works for the three disciplines includes: • Feasibility • Survey, investigation, and reporting • Option selection (involving outline methodology) • Outline and detailed design (including temporary works) • Implementation (including demolition) • Commissioning • Hand back into maintenance • Statutory consents and permissions • If directed, third party access agreements The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.

Scope

Reference
ocds-h6vhtk-03b247
Commercial tool
Standalone contract
Main category
works
CPV classifications
34632300
45100000
45210000
45213320
45213321
45221112
45221122
45221242
45234000
45234100
45234114
45234115
45234116
45315400
45315600
50225000
51100000
71311230
71320000
71322000
Contract locations
UK

Submission & procedure

Procedure
Negotiated procedure with prior call for competition

Award details· 4 awards

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Lots · 2 total

Divisions of the contract. Each lot can be awarded separately.

View all →
LotTitleEst. valueStatus
Lot A1Lot A1 – Regional Multi-discipline £7m - £200m Projectscancelled
Lot A2Lot A2 – Multi-discipline £7m – £50m projectscancelled