AREA 4 20/21 MALTON FOOTWAYS R&R
Estimated value
£185k
Awarded value
£185k
Suppliers
1
Lots
1
Published
16 Oct 2020
Description
Treatment of the footways and carriageway on U329 Maiden Greve. Works consist of 20mm, 30mm and 70mm deep footway resurfacing including replacement of damaged kerbs along inner curve of carriageway, raising low kerbs at footway crossings and replacement/resetting of iron works, and one section of carriageway patching/reprofiling at a failed area of carriageway. Treatment of the footways and carriageway on U332 Middlecave Road. Works consist of 70mm deep footway resurfacing, replacement of damaged kerbs along inner curve of carriageway, replacement of service covers, installation of edging kerbs, re-setting of channels, replacement of kerbs and reprofiling carriageway at uncontrolled crossing, and resurfacing at 50mm deep of a vehicle access at the school. Treatment of the footways and carriageway on U336 Mount Crescent. Works to include kerb replacement and footway re-surfacing at 20mm and 100mm depths, carriageway patching at 100mm deep and reinstatement/refreshing of road markings between the traffic signals at Newbiggin junction to Middlecave Road junction. Treatment of the footways on U362 Orchard Road. Works consist of 20mm and 70mm deep footway resurfacing, replacement of damaged kerbs, raise low kerbs at driveway crossings and repair damaged footways at driveway crossings, and installation of edging kerbs. Also included is perforation of a section of footpath and reinstatement to a grassed area at Bramble Walk and construction of 220mm deep Type 1 footway to replace the removed section along the edge of carriageway. Existing ironworks to be adjusted to be replaced/reset to accommodate new footway levels. Treatment of the carriageway and footway on Russett Road. Works consist of kerb and channel replacement at two short sections on Russett Road and reinstatement/repair of the footway areas behind the kerbs. works also include milling to a depth of 40mm two sections of carriageway which have settled and reprofiling the carriageway with surfacing and regulating.
Scope
- Reference
- NYCC001-DN490676-42189042
- Total value
- £185,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 27 Sept 2020 to 08 Nov 2020
- CPV classifications
- 45233000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 28 Aug 2020, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£185k
Award date
07 Sept 2020
Contract start
27 Sept 2020
Contract end
08 Nov 2020
Awarded suppliers· 1 supplier
Awarded 07 Sept 2020 · Contract period 27 Sept 2020 — 08 Nov 2020
Other contracts from North Yorkshire County Council
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to CEMEX UK Operations Limited· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| PLACE626H Q1 2026 Roadstone - CEMEX UK Materials Ltd | contract | £100k | 03 Jun 2026 |
| CPU 8051 Construction Materials (Aggregates & Asphalts) | contract | — | 20 Feb 2026 |
| PLACE626H Q2 2025 Roadstone - CEMEX | contract | £200k | 11 Jul 2025 |
| PLACE626H Q1 2025 Roadstone - CEMEX UK LTD | contract | £367k | 23 Apr 2025 |
| PLACE626H Q4 25 Roadstone - Cemex | contract | £210k | 05 Mar 2025 |
| PLACE626H Supply of Roadstone Materials | contract | — | 11 Feb 2025 |
| Supply of Highways Materials - Call Off #1 March 2022 | contract | — | 08 Apr 2022 |
| ETE067 - Supply of Coated Roadstone Materials | contract | — | 19 Jan 2022 |
| ETE066 - Supply of Dry Roadstone Materials | contract | — | 11 Jan 2022 |
| Area 7 21/22 Carriageway Schemes Cat 2, 3 A70001 | contract | £165k | 23 Dec 2021 |