Strategic Flood Risk Assessment and Water Cycle Study
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
28 May 2026
Description
The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA). The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.
Scope
- Reference
- BCKLWN378
- Commercial tool
- Standalone contract
- Contract dates
- 05 Apr 2026 to 05 Apr 2027Possible extension to 05 Apr 2028
Up to 1 year
- CPV classifications
- 907000009071110090712000
- Contract locations
- North and West Norfolk, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Total Fixed Price for completion of the Assessment | And Hourly Rate | price | 45.00% |
| Methodology | Methodology | quality | 30.00% |
| Project Programme | Project Programme | quality | 25.00% |
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
13 Apr 2026
Contract start
28 May 2026
Contract end
26 Apr 2027