High Ropes Repair at Carlton Adventure
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
16 Apr 2026
Description
These works relate to the replacement of a defective structural pole identified during a recent safety inspection at Carlton Adventures High Ropes Course. The supplier selected (Technical Outdoor Solutions) to carry out these works designed and rewired the course in 2016/2017 and retain knowledge of the original design, engineering tolerances and integrated safety systems. The replacement must align precisely with the existing structure to maintain certification and safe operation. Technical Outdoor Solutions are the only provider in the North East with the required expertise and familiarity with this installation. The repair is a matter of urgency to mitigate safety, operational risk and existing business and bookings and the use of the original supplier enables swift action and minimal disruption.
Scope
- Reference
- OPEN15042026155622
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Below threshold - without competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—