Well-Adapted UK floods workstream
Estimated value
—
Awarded value
£51k
Suppliers
1
Lots
1
Published
02 May 2025
Description
Aims and Objectives The CCC require an update of the flood risk and adaptation analysis carried out in CCRA3. We require a supplier to carry out quantitative modelling to provide a robust and comparable evidence base to our previous assessment. The commissioned update should be constructed in a way that it can be linked to the separate CCC commission of a vulnerability dataset, which includes a flood vulnerability index. The commissioned analysis should: • Update CCRA3 flood risk analysis with the most recent input data on present day risk (e.g. from the 2024 National Flood Risk Assessment NaFRA2 for England). • Test the investment requirement to maintain present-day risk, using a range of adaptation measures within the current flood defence portfolio. • Assess the optimum level of investment for flood risk reduction.
Scope
- Reference
- PS25087
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Direct award
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£51k
Award date
—
Contract start
14 May 2025
Contract end
31 Oct 2025