CDEL/KAS/DOW 3/24/15332 - WORKSHOP REFURBISHMENT WORKS-DESIGN ITT
Estimated value
—
Awarded value
£40k
Suppliers
1
Lots
1
Published
12 Aug 2025
Description
A feasibility study will be conducted to evaluate the current condition and functionality of the following facilities: Workshop 1 at London Fashion College The Main Store and the relocation of existing storage facilities to the area adjacent to the E Wing, where portacabins will be installed to accommodate the stores The Psychology Unit and the relocation of the Psychology Team to a newly obtained portacabin, situated in the external space adjacent to C Wing The Education Building – Hairdressing Classroom The purpose of this study is to evaluate the current condition of the facilities, assess the viability of services, and undertake comparative analyses. The study will determine the necessary requirements and identify improvements needed to upgrade the facilities to high, medium, or low specification standards (Reference: Guidance – BASIC DESIGN BRIEF FOR PSPI WORKSHOPS). Additionally, the study will provide Cost Plans for the required works to ensure an informed approach to implementation To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=959192212
Scope
- Reference
- CDEL/KAS/DOW 3/24/15332
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Below threshold - limited competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£40k
Award date
05 May 2025
Contract start
25 Aug 2025
Contract end
18 Nov 2025