KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)
Estimated value
£3.8m
Awarded value
—
Suppliers
0
Lots
1
Published
01 May 2026
This is a preliminary market engagement notice
Map the supplier landscape and document your shortlist before opening the tender. The market simulation produces a defensible audit record you can attach to your procurement file.
Description
The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.
Scope
- Reference
- ocds-h6vhtk-06905f
- Total value
- £3,800,000 excluding VAT£4,750,000 including VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 01 Dec 2026 to 30 Nov 2027
- Main category
- works
- CPV classifications
- 45262660
- Contract locations
- North West England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Procedure
- Competitive flexible procedure