C2526 Maintenance Dredging - 2025 Campaign
Estimated value
—
Awarded value
£57.0m
Suppliers
1
Lots
1
Published
14 Oct 2025
Description
To ensure deep draft vessels can continue to access London Gateway Port, Maintenance Dredging of the part of the Navigation Channel and berth pocket is required. The Works require dredging at areas within the Yantlet (Sea Reach and Manoeuvring Area), areas at the Sunk, areas in Knock John Channel together with the removal of high spots in the berth pockets. In addition, the Employer may instruct additional Works comprising dredging at areas at the Yantlet/West Oaze and Black Deep The Works shall include for the mobilisation and demobilisation of dredging equipment to carry out Maintenance Dredging to the required depth and to the extents shown on the tender Drawings.
Scope
- Reference
- ocds-h6vhtk-056674
- Commercial tool
- Standalone contract
- Contract dates
- 30 Sept 2025 to 02 Mar 2026Possible extension to 02 Apr 2026
Change in the scope of works; increased depths
- CPV classifications
- 45252124
- Contract locations
- Thurrock, United Kingdom
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Technical | — | quality | 30.00% |
| Commercial | — | cost | 70.00% |
Participation
Conditions suppliers must meet to bid.
As stated on the tender documents on Oracle tendering portal
Previous maintenance dredging experience
Submission & procedure
- Procedure
- Competitive flexible procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£57.0m
Award date
13 Oct 2025
Contract start
03 Nov 2025
Contract end
01 Nov 2027