Clyde Waterfront and Renfrew Riverside (CWRR) Maritime Linesmen
Estimated value
—
Awarded value
—
Suppliers
0
Lots
1
Published
08 Jul 2025
Description
The CWRR project includes a new opening road bridge linking Renfrew to Glasgow and West Dunbartonshire at a location just east of Rothesay Dock on Dock Street Clydebank. The operational provisions require that the bridge opens to shipping as a priority over road traffic crossing the bridge. While the bridge is designed and constructed in a manner which minimises the risk of the bridge failing to open when required. It also includes a number of redundancy features to enable intervention to overcome mechanical failure and allow the bridge to open. As an absolute fail-safe measure, the project includes a layby berth, located on the riverside of Rothesay Dock, where vessels travelling up river, will be able to berth, should all other measures not allow the bridge to open. The Council are looking to appoint two suitably experienced Maritime Linesmen, who will be available 24 hours per day, 365 days per year on on-call basis to support mooring and let go operations as and when required by the Client and in the event of the bridge not opening.
Scope
- Reference
- RC-CPU-24-045
- Commercial tool
- Standalone contract
- Contract dates
For the avoidance of doubt, the Contract includes optional break clause options at end of year 3 and year 4 which can be used at the Council's sole discretion in accordance with the contract.
- Main category
- services
- CPV classifications
- 63721000637230006372400034500000345100006372661060640000
- Contract locations
- Scotland
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Methodology and Approach to delivering the services | 25 | quality | — |
| Availability and Quality of Resources | 15 | quality | — |
| Fair Work First | 5 | quality | — |
| — | 55 | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—