For the provisions of Mobile Plant RRC's

LondonEnergy LtdcontractFind a TenderRef ocds-h6vhtk-06a32bProcurement Act 2023active
View buyer

Estimated value

£750k

services

Awarded value

Suppliers

0

Lots

3

0 awarded

Published

30 Jun 2026

Deadline 25 Jul 2026

Description

Lot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. To be fitted with long arms. To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). Lot 2 Maintenance includes: - Servicing - Electrical upgrades - Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. - Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability - Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract Lot 3 Maintenance includes: - Tyres - Tail blades - There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. - All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) -

Scope

Reference
1046017329
Total value
£750,000 excluding VAT
£900,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
30 Sept 2026 to 01 Oct 2029
Possible extension to 01 Oct 2031

The Contract shall commence on 1 October 2026 for an initial term of three (3) years, with the option to extend for up to a further two (2) years on a year-by-year basis (3+1+1), subject to mutual agreement between the parties.

Main category
services
CPV classifications
34000000
45252110
45259000
50000000
Contract locations
London, United Kingdom

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality60 Quality/40 Pricequality100.00%

Submission & procedure

Submission deadline
25 Jul 2026, 10:59 pm
Submission address
https://www.delta-esourcing.com
Electronic submission
Yes
Procedure
Open procedure

Lots · 3 total

Divisions of the contract. Each lot can be awarded separately.

View all →
LotTitleEst. valueStatus
1Requirements for mobile plants at LondonEnergy RRC's£250kactive
2Maintenance£250kactive
3Maintenance includes£250kactive