Floating Offshore Wind - Advanced Manufacturing of Substructure Components ORE/22/023
Estimated value
£185k
Awarded value
£185k
Suppliers
1
Lots
1
Published
02 Jun 2022
Description
· Assess the state of the art review of FOW and fixed bottom wind substructure designs / typologies to identify common components, materials, manufacturing and assembly methodologies (including primary component fabrication, secondary component fabrication, component assembly, painting / blasting, final fit out (to create complete substructure); · Assess the state of the art of major (representative) international manufacturing facilities with capability to deliver these major components; · Assess the state of the art of "advanced" methods of manufacturing, assembling, blasting and painting such components (either in use at commercial scale or sufficiently well developed for commercial application in the near term and with either evolutionary or disruptive impacts) in the context of these being applied in a serial manufacturing process; · Analyse the potential to utilise advanced manufacturing methods (including design for manufacture methodologies) to reduce the cost of fixed and floating wind substructures, including techno-economic study of impact on LCOE; · Analyse the potential blockers to adopting advanced manufacturing methods for offshore wind. Tender documents available free of charge at https://procontract.due-north.com
Scope
- Reference
- OREC001-DN601394-30827124
- Total value
- £185,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 22 Apr 2022 to 17 Feb 2024
- CPV classifications
- 71620000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 19 Apr 2022, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£185k
Award date
10 May 2022
Contract start
22 Apr 2022
Contract end
17 Feb 2024