Floating Offshore Wind - Advanced Manufacturing of Substructure Components ORE/22/023

Offshore Renewable Energy CatapultcontractContracts FinderRef OREC001-DN601394-30827124SME suitablecomplete
View buyer

Estimated value

£185k

Awarded value

£185k

Awarded 10 May 2022

Suppliers

1

Lots

1

1 awarded

Published

02 Jun 2022

Deadline 19 Apr 2022

Description

· Assess the state of the art review of FOW and fixed bottom wind substructure designs / typologies to identify common components, materials, manufacturing and assembly methodologies (including primary component fabrication, secondary component fabrication, component assembly, painting / blasting, final fit out (to create complete substructure); · Assess the state of the art of major (representative) international manufacturing facilities with capability to deliver these major components; · Assess the state of the art of "advanced" methods of manufacturing, assembling, blasting and painting such components (either in use at commercial scale or sufficiently well developed for commercial application in the near term and with either evolutionary or disruptive impacts) in the context of these being applied in a serial manufacturing process; · Analyse the potential to utilise advanced manufacturing methods (including design for manufacture methodologies) to reduce the cost of fixed and floating wind substructures, including techno-economic study of impact on LCOE; · Analyse the potential blockers to adopting advanced manufacturing methods for offshore wind. Tender documents available free of charge at https://procontract.due-north.com

Scope

Reference
OREC001-DN601394-30827124
Total value
£185,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
22 Apr 2022 to 17 Feb 2024
CPV classifications
71620000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
19 Apr 2022, 11:00 am

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£185k

Award date

10 May 2022

Contract start

22 Apr 2022

Contract end

17 Feb 2024