INVITATION TO TENDER FOR THE CONCEPT PROPOSAL, DETAILED DESIGN AND INSTALLATION OF GLOVEBOX EXTRACT VENTILATION TO THE FUSION ROOM IN THE MATERIALS RESEARCH FACILITY AT CULHAM SCIENCE CENTRE
Estimated value
£210k
Awarded value
—
Suppliers
0
Lots
1
Published
10 Jan 2019
Description
A new active ventilation system to support ongoing activities in MRF building within the Fusion room is required [1]. The system will comprise of the following: 1. A new dry glove box extract to support the proposed 11 glove boxes to be located in the Fusion Room. In addition, the existing red extract system in the facility will be coupled with the new glovebox extract system. Such that, in the event of a fan failure at either the red extract or glovebox extract, the other fan can deliver the duty of both the red extract and glovebox extract systems. 2. Integrate the control philosophy of the existing red extract fan and the glovebox extract to enable them to act as duty/ standby in the event of either of the fans failing. UKAEA have completed an option assessment which identifies that considerable advantages that can be gained by coupling the existing red extract system with the Glovebox extract system which will add complementary resilience in terms of duty/ standby for both the red extract and glove box systems. The glovebox extract shall be sited where the space for the provisional standby red extract fan is located, the ventilation control panel and inverters will be located within the space provision available for the standby red extract fan.
Scope
- Reference
- T/LKT080/18
- Total value
- £210,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 17 Feb 2019 to 31 Jan 2020
- CPV classifications
- 39563530 39714000 45331210 51000000 71000000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 21 Jan 2019, 12:00 am