Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking

View buyer

Estimated value

Awarded value

£43k

Awarded 01 Dec 2020

Suppliers

0

Lots

1

1 awarded

Published

12 Mar 2021

Deadline 13 Nov 2020

Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works Part 1) Scope of Supply Attenuation Tank:- BMB JV require fabrication and supply of permanent formwork for an Attenuation Tank at Hammersmith site. Panels shall be made to the geometry displayed in the drawings provided for the Attenuation Tank. All panels are to be laminated as the soffit will be submerged by BMB JV systematically. Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence. Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply. All supporting documentation for a material compliance report should be provided prior to order delivery. No openings are required as BMB JV will post cut on site. Attenuation Tank Building Drawings 3320-AAJVX-HAMPS-540-SZ-DR-000040 3320-AAJVX-HAMPS-540-SZ-DR-000041 Part 2) Hammersmith Shaft Scope of Supply: - BMB JV require fabrication and supply of permanent formwork for a drop shaft at Hammersmith site. The supplier is to conduct a design check on the panels proposed for permanent and temporary loadings and spans for the Hammersmith Shaft. Supply of all ancillary items such as grout check and joint sealing tapes should be detailed and included in the supply. Panels shall be delivered to site labelled in-order to allow BMB JV to install the panels in the correct sequence. Supplier will produce manufacturing drawings for panel layout for BMB's approval. All documentation to be supplied for panel layout to be checked by BMB temporary works department before commencement

Scope

Reference
C4A52134406
Commercial tool
Standalone contract
Contract dates
01 Dec 2020 to 05 May 2021
CPV classifications
44114250 45223500 45262310 45262311

Submission & procedure

Submission deadline
13 Nov 2020, 12:00 pm

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£43k

Award date

01 Dec 2020

Contract start

01 Dec 2020

Contract end

05 May 2021