TC01361 - Purchase of Four (4) Ship to Shore Quay Cranes

THE FELIXSTOWE DOCK AND RAILWAY COMPANYcontractFind a TenderRef ocds-h6vhtk-0584a1Procurement Act 2023active
View buyer

Estimated value

Awarded value

£43.6m

Awarded 28 Sept 2025

Suppliers

1

Lots

1

1 awarded

Published

29 Sept 2025

Description

The Port of Felixstowe requires four (4) ship to shore quay cranes for the handling of ISO containers and other defined loads with challenging technical specifications, particularly with regard to wheel load bearing capacity. Delivery to Port of Felixstowe.

Scope

Reference
TC01361
Commercial tool
Standalone contract
Contract dates
07 Oct 2025 to 31 Oct 2026
Possible extension to 31 Jan 2027

Delay in production or shipping requirements

CPV classifications
42414120
Contract locations
Suffolk, United Kingdom

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Stage 1 - Evidence for the supply of a quay crane and Detailed Technical Design outlining the design calculations as a minimum in line with the technical specification criteria. These calculations shall be used for wheel loads in normal and storm conditionEvidence that a quay crane can be supplied as per the technical specification. AND A Detailed Technical Design shall be submitted outlining the design calculations as a minimum in line with the technical specification criteria. These calculations shall be used for wheel loads in normal and storm condition. Refer to Part IV in the Form of Tender document for technical details to be met.quality
Stage 1 - A detailed maintenance strategyA detailed maintenance strategy over the expected operational life of the quay crane (to achieve up to 4 million cycle). Include: • Preventive and corrective maintenance schedules • Labour and spare parts assumptions • Downtime impact and mitigation In addition - Submit the following if available: • Total Cost of Ownership (TCO) model in spreadsheet format • Lifecycle Cost Analysis (LCCA) or sensitivity analysisquality
Stage 1 - Equipment PerformanceProvide evidence of equipment performance and expected/proven metrics of equivalent cranes already supplied to other customers with measurable targets linked to proactive maintenance and performance monitoringquality
Stage 1 - Spare Parts ManagementDescribe how you would support our spare parts management. This shall include availability timelines, sourcing approach (i.e. direct purchase or consignment), and how you will assist in the management of obsolescence over the crane's operational life.quality
Stage 2 - Delivery and commissioning lead timeDelivery lead time and Commission to final acceptance - from date the order is placed to fully operable as set out in Part III (a) is accepted by the Purchaserquality
Stage 2 - PriceBase contract price for all items set out in Part 1(a) for Element 1 and Option 1price
Stage 2 - SustainabilityDescribe how your organisation is working towards achieving Net Zero carbon emissions. Please include a copy of your Carbon Reduction Plan or equivalentquality
Stage 2 - SustainabilityPlease explain how the equipment you are supplying minimises energy use and emissions across its lifecycle. Include references to energy ratings, fuel efficiency, electrification, or low-emission technologies. To include expected energy usage in one container, move and one kilometre of gantry operation at full speed.quality
Stage 2 - SustainabilityWhat measures have been taken to ensure the equipment is designed with sustainability in mind (e.g., recycled materials, modular design, ease of repair, end-of-life recycling)?quality
Stage 2 - SustainabilityList any environmental & quality certifications or standards the equipment and/or the supplier complies with (e.g., ISO 14001, Eco-Design, RoHS, REACH, CE marking).quality
Stage 2 - SustainabilityWhat steps will you take to minimise environmental impact in production, procurement & delivery of the equipment. Demonstrate the carbon impact in tons of CO2 for the procurement of the equipment.quality
Stage 2 - SustainabilityHow will your contract delivery support social and environmental value in the UK & within your business location, such as biodiversity protection, air quality improvement, or local community benefits.quality
Stage 2 - SustainibilityPlease describe any innovative approaches your equipment or service offers that contribute to sustainability goals (e.g., digital efficiency monitoring, AI optimisation, renewable power integration).quality
Stage 2 - Deviations to the Conditions of Contract or Technical SpecificationNo material deviations to Conditions of Contract or Technical Specifications - Deviations will be considered material if they could result in i) additional cost or ii) additional risk to the Purchaserquality

Participation

Conditions suppliers must meet to bid.

The Purchasers Finance Department will undertake a financial assessment of the Suppliers financial standing, using an obtained finance report. Suppliers must pass this assessment.

Submission & procedure

Procedure
Open procedure

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£43.6m

Award date

28 Sept 2025

Contract start

02 Oct 2025

Contract end

01 Oct 2027