HS2 Limited High Voltage (HV) Power System

HS2contractContracts FinderRef tender_241617/1445170complete
View buyer

Estimated value

£328.2m

Awarded value

£328.2m

Awarded 20 Jan 2025

Suppliers

1

Lots

1

1 awarded

Published

20 Feb 2025

Deadline 21 Nov 2023

Description

The High Voltage (HV) Power Systems package of work comprises: - design, build, testing and commissioning of the High Voltage (HV) traction power systems, 33kV and 11kV non-traction power systems and HV SCADA (Supervisory Control and Data Acquisition) for the HS2 Project. - ongoing maintenance activities in connection with the High Voltage (HV) Power Systems. The HV Traction Power Systems include a traction power electrification system which will be a -25-0-25kV Autotransformer system with a nominal fault current level of 15 kA. The system will be designed to supply traction power into the Overhead Catenary System (OCS) - provided by others to enable the railway operator to run its specified train timetable. The non-traction power systems will supply all necessary railway systems facilities in tunnels and open route at the appropriate, power demand and system availability. The non-traction power systems will be a dedicated private network distributed within the tunnels and open route supplied by connections to the DNO (provided by the Employer). The 33kV and 11kV is to be transformed down at specified locations by the contractor to enable the onward supply of LV power (provided by others) to stations, shafts, portals, tunnels and rail systems. The High Voltage (HV) Power Systems Contractor is the Principal Contractor (PC) for the railway systems compounds. The High Voltage (HV) Power Systems Contractor will supply traction and non-traction power to the HS2 rolling-stock maintenance depot at Washwood Heath (Birmingham), this will include interfacing with the Network Integrated Control Centre (NICC). The HV Power Systems Contractor is required to provide temporary supplies for construction use at its Railway Systems Compounds (RSC) where it is principal contractor, this may involve adopting the temporary supplies previously provided by MWCC. This notice also relates to a maintenance contract, pursuant to which the contractor shall provide maintenance services in relation to the completed works. The maintenance contract will be valid for an initial term of 7 years with options to extend and will commence on the first sectional completion of the works under the design and build contract.

Scope

Reference
tender_241617/1445170
Total value
£328,237,076.84 excluding VAT
Commercial tool
Standalone contract
Contract dates
03 Feb 2025 to 26 Aug 2049
CPV classifications
31170000 31174000 31214000 31321300 31682540 34632300 34940000 42961200 45230000 45234100 45310000 45315400 45317200 45317300 50200000 71320000

Submission & procedure

Submission deadline
21 Nov 2023, 12:00 pm

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£328.2m

Award date

20 Jan 2025

Contract start

03 Feb 2025

Contract end

26 Aug 2049