LINC 144 - Steel Fibre Reinforced Concrete Technology Development
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
22 Oct 2025
Description
Sellafield has a requirement to design and manufacture waste containers that are cost effective with respect to material, manufacturability, and infrastructure (throughput driven). These waste containers (WC) will be primarily used the for long-term storage of solid Low-Level Waste (LLW) which are intended to be temporarily stored in CHILW (interim storage facility) and subsequently in a Geological Disposal Facility (GDF). Steel Fibre Reinforced Concrete (SFRC) material is identified as a potential solution for a cost-effective waste container solution. Therefore, under the governance of the Manufactured Product Organisation (MPO), the Civil Structural & Architectural (CS&A) capability is carrying out a series of gated technical exercises to establish a calibrated material model which will enable the substantiation of the waste container’s performance requirements via digital simulation.
Scope
- Reference
- C27340
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Below threshold - limited competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Awarded suppliers· 1 supplier
Awarded —
Other contracts from Sellafield Limited
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to MCM Environmental Services Ltd· 3
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Pre-Concept Safety Assessment Information Maps | contract | £50k | 24 Mar 2026 |
| Post-Closure Safety Case Framework | contract | — | 21 Oct 2025 |
| Chair for Technical Advisory Panel | contract | £21k | 08 Jun 2016 |