VT3 Phase 3 A & B - Civil Engineering Works Contract

Belfast HarbourcontractFind a TenderRef ocds-h6vhtk-03844032014L0025active

Estimated value

works

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

21 Jun 2023

Description

The successful bidder shall supply, construct, and install all permanent works and all associated temporary works within an operational container terminal ("Works"). Please note that these works will be sequenced in 7 Phases and shall take place within an operational container terminal The Works will include the following; • Liaising, coordinating and co-operating with Irish Continental Group to ensure the Works are carried out in a safe manner within the operational terminal and cause as little disruption as possible to the ongoing operations. • Laying of approximately 9,200m2 of pavement quality concrete • Laying of approximately 7,928 m2 of hot rolled asphalt • Laying of approximately 10,600m2 of gravel surfacing • Installation of 450m of heavy-duty storm slot drains • Installation of all other associated storm drainage • Construction of 4nr reefer towers with piled foundations • ISPS boundary and internal paladin fencing and gates • Estimated programme for the works is 80 weeks • M&E Services including HV and LV power networks, lighting, data connections and all associated civil engineering works including, ducting and chambers. • Approximate length of HV cabling: 1350m • Number of reefer towers to be connected: 4

Scope

Reference
P330
Commercial tool
Standalone contract
Main category
works
Contract locations
Northern Ireland

Submission & procedure

Procedure
Negotiated procedure with prior call for competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to
MC
SME