VT3 Phase 3 A & B - Civil Engineering Works Contract
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
21 Jun 2023
Description
The successful bidder shall supply, construct, and install all permanent works and all associated temporary works within an operational container terminal ("Works"). Please note that these works will be sequenced in 7 Phases and shall take place within an operational container terminal The Works will include the following; • Liaising, coordinating and co-operating with Irish Continental Group to ensure the Works are carried out in a safe manner within the operational terminal and cause as little disruption as possible to the ongoing operations. • Laying of approximately 9,200m2 of pavement quality concrete • Laying of approximately 7,928 m2 of hot rolled asphalt • Laying of approximately 10,600m2 of gravel surfacing • Installation of 450m of heavy-duty storm slot drains • Installation of all other associated storm drainage • Construction of 4nr reefer towers with piled foundations • ISPS boundary and internal paladin fencing and gates • Estimated programme for the works is 80 weeks • M&E Services including HV and LV power networks, lighting, data connections and all associated civil engineering works including, ducting and chambers. • Approximate length of HV cabling: 1350m • Number of reefer towers to be connected: 4
Scope
- Reference
- P330
- Commercial tool
- Standalone contract
- Main category
- works
- Contract locations
- Northern Ireland
Submission & procedure
- Procedure
- Negotiated procedure with prior call for competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—