Area 4 Buttercrambe, Stamford & Helperthorpe R&R Package
Estimated value
£382k
Awarded value
£297k
Suppliers
1
Lots
1
Published
17 Aug 2020
Description
Buttercrambe: Works under 8-hour daytime road closure. Single track lane with limited passing places or turning areas. Isolated lengths of kerbing/channelling to delineate and provide support to edge of carriageway. Provision of concrete lined drainage grips. Some carriageway reconstruction/widening works with excavation up to 350mm deep. Mainly overlay of existing carriageway with depths varying 60mm, 100mm to 160mm. Stamford: Works under 8-hour daytime road closure but would prefer 3-way traffic signals if geometry allows. 50m length of kerbing/channelling with 50m x 1m x 40mm deep patch reinstatement to front to arrest overrun damage. Working time restriction 0930 to 1630 to avoid peak traffic flow. Helperthorpe: Works under 8-hour daytime road closure. Single track lane with limited passing places or turning areas. Isolated lengths of kerbing/channelling to delineate and provide support to edge of carriageway. Mainly overlay of existing carriageway with depths varying 60mm, 100mm to 200mm. Short length of 200mm deep inlay.
Scope
- Reference
- NYCC001-DN488053-63308635
- Total value
- £382,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 06 Sept 2020 to 22 Oct 2020
- CPV classifications
- 45233000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 07 Aug 2020, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£297k
Award date
10 Aug 2020
Contract start
06 Sept 2020
Contract end
22 Oct 2020