Christopher Ingold Building 1st Floor Labortaory 129 Alterations
Estimated value
£105k
Awarded value
£105k
Suppliers
1
Lots
1
Published
26 May 2016
Description
Refurbishment of existing laboratory space at 1st floor, UCL Christopher Ingold Building, 20 Gordon Street, London WC1H 0AJ. Refurbishment works required to the 1st floor of the Christopher Ingold Building in room 129. • The following works will include a contractors design portion; medical gas line instillation. • A list of approved firms to carry out the services installation is included in Appendix C, however it is the Contractor's responsibility to ensure they have sufficient resources to carry out the works over the proposed construction programme. • Normal UCL Permit to works and notice periods will be required to specific works as referred to in Fowler Martin's Specfication / tender Documents. These include but are not limited to shutdown of services and connection to building infrastructure and access to areas outside of the project area. • The works are to include all temporary works, deemed necessary for efficient progression of the works.
Scope
- Reference
- UCL-PROC-262
- Total value
- £105,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 22 May 2016 to 22 Sept 2016
- CPV classifications
- 45210000 45453000
Submission & procedure
- Submission deadline
- 08 May 2016, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£105k
Award date
19 May 2016
Contract start
22 May 2016
Contract end
22 Sept 2016