WP3360-Bollards Installation Works - CTA Main Works
Estimated value
£1.0m
Awarded value
—
Suppliers
0
Lots
1
Published
21 Oct 2025
Description
The scope includes specialist bollard installation in the CTA tunnel at Heathrow. Bollards & Tactile Paving Overview: Part of the Tunnel Accessibility design package, the bollards and tactile paving are intended to make accessing the cross-passage doors safe and more intuitive to use. The bollards are to frangible plastic bolted down into the surface. The tactile paving is to be blister type and adhesive. Interfaces: None beyond standard tunnel working Constraints: Site works during bore closure only Quantities: Bollards: 20no. (4no. Per location) Tactile Paving: 21m2 (4.2m2 per location) Locations: 5no. (includes both sides of CPD)
Scope
- Reference
- C4N101492204
- Total value
- £1,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 13 Mar 2026 to 31 Oct 2026
- CPV classifications
- 45233291 34928450
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 27 Oct 2025, 9:34 pm