Campbeltown Flood Protection Scheme Works

Argyll and Bute CouncilcontractFind a TenderRef ocds-h6vhtk-02a32f32014L0024active
View buyer

Estimated value

works

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

07 Jun 2022

Description

Argyll and Bute Councils’ aims and objectives for the Campbeltown Flood Protection Scheme Works are to: - Reduce the risk of river flooding in Campbeltown - Reduce the risk of surface water flooding in Campbeltown The scope of the contract is: - Millknowe Flood Storage Reservoir – Construction of an impounding structure across the river and floodplain, flow control culvert and spillway. Sheet pile flood walls will form part of the storage area to protect the industrial estate. - Dalaruan Culvert Upgrade – Partial upgrade to increase capacity for the Millknowe and Balegreggan Burns. Upsize a 270m length from the Millknowe intake. Pipe diameters will be increased to between 675 – 1200mm. - Surface Water Elements – Retrofit of Sustainable Urban Drainage Systems, within urban setting, to reduce load on the combined drainage network. Providing new drainage lines for existing road drains to disconnect from the combined network. Two detention basins and two filter drains are to be provided in above ground storage in the Meadows and below ground tank type storage at Burnside car park.

Scope

Reference
ocds-h6vhtk-02a32f
Commercial tool
Standalone contract
Main category
works
CPV classifications
45246000
Contract locations
Scotland

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality60quality
40price

Submission & procedure

Procedure
Restricted procedure

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to