Temporary Works Designer - Framework
Estimated value
£1.0m
Awarded value
—
Suppliers
0
Lots
1
Published
01 May 2026
Description
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Scope
- Reference
- C4N111835379
- Total value
- £1,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 04 Oct 2026 to 29 Sept 2027
- CPV classifications
- 71311000 71530000 71320000 80330000 71220000 79410000 79411100 90721000 71600000 22314000 71311300 71310000 73000000 71621000 79415200 71242000 72224000 98110000 98112000 71322000 73200000 71318000 79417000 71311200 79411000 71317200 79400000 79933000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 15 May 2026, 3:30 pm