UHW CFPU Chiller Controls Upgrade

Estimated value

goods

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

14 Feb 2025

Description

Cardiff and Vale University Health board (CVUHB) have a need to implement a contract for the Upgrade UHW CFPU Chiller Controls. During Summer periods the Blast Chillers and Freezers within the CFPU were unable to maintain the required temperatures to safely chill and freeze food being produced for patients. This resulted in food having to be purchased by external providers to feed patients. The cause of the temperature issues was due to the Condenser units for the Blast Freezers and Chillers being located above the CFPU within an internal roof space. During summer periods the roof space would overheat stopping the Condensers from being able to function correctly and provide the required temperatures to safely chill and freeze food. Terratherm are the only supplier capable of supplying and installing the replacement equipment, re-commissioning of the equipment as they were involved in the previous schemes carried out in the last financial year for the works on the condensers.

Scope

Reference
CAV-VEA (24-25) 210
Commercial tool
Standalone contract
Main category
goods
CPV classifications
31625000
31625200
31625100
Contract locations
Wales

Submission & procedure

Procedure
Award procedure without prior publication of a call for competition

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to