Managed WAN Services 2025 - New contract for existing Wide Area Network
Estimated value
£2.3m
Awarded value
£2.3m
Suppliers
1
Lots
1
Published
05 Aug 2025
Description
1. Deep Integrated and Bespoke Solution: Redcentric successfully designed, migrated and implemented IOPC's comprehensive network and data centre solution. This includes managed site-to-site and client VPNs, resilient internet access, critical firewall configurations, and continuous monitoring. These services are fully integrated across the IOPC Farnborough and Corsham Crown Hosting data centres, supporting both production and disaster recovery environments. The solution is uniquely tailored to IOPC's specific architecture and operational requirements. 2. Maintaining Operational Resilience and Continuity Operational resilience is fundamental to IOPC's services and is intrinsically embedded within the existing solution. Redcentric established automated failover between our data centres, configured secure MPLS connectivity, and implemented live replication services, all of which are actively supporting IOPC's business-as-usual operations. Transitioning these highly complex and interconnected services to a new provider would necessitate dismantling and revalidating live configurations, significantly increasing the risk of widespread system outages or degraded service performance. Any switch would also risk the loss of critical configuration knowledge and jeopardise existing fail-safe mechanisms due to the intricate nature of the setup. 3. Incompatibility with Existing Infrastructure and Investment The IOPC has made substantial investment in equipment and service integrations that are intrinsically linked to RedCentric systems and operational frameworks. introducing a new supplier at this stage would require reverse-engineering a live, bespoke solution. This would not only incur significant duplicative costs for infrastructure and re-implementation but also render parts of the existing estate incompatible or redundant. Such a change would undermine the value of the solution already delivered, severely disrupt essential business operations, and delay the realisation of long-term efficiencies envisaged in our original disaggregation strategy. 4. Unacceptable Risk of Service Disruption: A procurement reset, and the introduction of a new supplier would pose an unacceptable risk of service disruption, critical configuration conflicts, and a breakdown in operational continuity due to the need to reverse-engineer and replace a live, highly customised and deeply embedded technical solution.
Scope
- Reference
- tender_500651/1505197
- Total value
- £2,317,226 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 31 Aug 2025 to 30 Aug 2028
- CPV classifications
- 72000000
Submission & procedure
- Submission deadline
- 16 Jun 2025, 4:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£2.3m
Award date
15 Jun 2025
Contract start
31 Aug 2025
Contract end
30 Aug 2028
Awarded suppliers· 1 supplier
Awarded 15 Jun 2025 · Contract period 31 Aug 2025 — 30 Aug 2028
Other contracts from Home Office
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to Redcentric Solutions Limited· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Provision of Wide Area Network (WAN) 2025-2028 | contract | £660k | 12 May 2026 |
| WHHT - Health and Social Care Network (HSCN) | call off | £130k | 09 Jan 2026 |
| ENHT - Health and Social Care Network (HSCN) | contract | £760k | 10 Dec 2025 |
| Unity Voice | contract | £903k | 07 Jul 2025 |
| Session Initiation Protocol (SIP) | contract | £88k | 17 Jun 2025 |
| YPO - 001229 Network Connectivity and Telecommunication Solutions II | call off | £18.8m | 26 Mar 2025 |
| 1895 NICOR Data Hosting for NHS Arden & Greater East Midlands CSU | contract | £21k | 10 Mar 2025 |
| Provision of HSCN Service to NHS Dorset | contract | £507k | 18 Nov 2024 |
| Purchase of replacement switches and supporting kit, for the Guildhall School of Music and Drama | contract | £49k | 12 Jun 2024 |
| HSCN/PSN & AWS secure networking | contract | £39k | 28 May 2024 |