Birnbeck Pier Reinstatement works
Estimated value
—
works
Awarded value
—
Suppliers
1
Lots
1
1 awarded
Published
04 Dec 2025
Description
Works to restore the Birnbeck Pier Structure connecting the mainland to the Birnbeck Island. This structure is Listed Grade II*. In summary, the works within scope are: • The removal, renovation and replacement of Birnbeck Pier bridge. • Dismantling and re-erection of the two bridge abutments. • Reinstatement of 14 No. Semi-circular cantilevered bays. • Bench seating running longitudinally along pier length (option dependant on budget). • Appropriate lighting (option dependant on budget).
Scope
- Reference
- DN758608
- Commercial tool
- Standalone contract
- Main category
- works
- Contract locations
- Bath / North East Somerset
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 70% | quality | — |
| Social Value | 10% | quality | — |
| — | 20% | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Awarded to