BEROE Framework
Estimated value
—
Awarded value
—
Suppliers
6
Lots
2
Published
02 Feb 2023
Description
DE&S (the Authority), under the Rapid Agile Prototyping, Scaled for Operations (RAPSO) Framework, intends to issue an Invitation To Tender “Lite” (ITT Lite) on behalf of Air Command (the Customer) to support the task objectives described in the Aim (below) and award zero (0), one (1) or more (with the intent being to take through two (2)) suppliers through to initial framework tasking under Lot 1). The intent for future BEROE work is to be placed under Lot 1 and/or the Operational Lot 2 subject to Authority approvals. Aim: The UK MoD requires a secure Ground Segment software solution for tasking, monitoring and controlling a space-based ISR constellation of Low Earth Orbit satellites(s), which will form an integral component of the UK MoD ground segment architecture, acting as the primary mission control system for the Customer Satellite Operations Centre. The UK MoD is therefore seeking a provider to develop a technology roadmap, secure software development plan and assist (through demonstration & prototype development) with the maturation of system requirements and the development of a software architecture that will deliver an assured Mission Control System for space-based ISR command & control (C2) which is scalable to meet future operational needs, and enable interoperability with UK MoD owned space assets.
Scope
- Reference
- 704294450
- Commercial tool
- Standalone contract
- Main category
- goods
- CPV classifications
- 34712000
- Contract locations
- UK
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| — | — | price | — |
Submission & procedure
- Procedure
- Restricted procedure
Award details· 6 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 2 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Ground segment software solutions (core plus adaptations) | — | cancelled |
| 2 | Operational Lot | — | cancelled |