Housing Solutions - Supply and installation of Kitchens and Bathrooms
Estimated value
£5.2m
Awarded value
—
Suppliers
0
Lots
1
Published
10 Jul 2025
Description
Scope and delivery of the work The work consists of replacement kitchens and bathrooms. A local and professional contractor is needed to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. However, an alternative pricing option is also to be submitted for non-Howdens Kitchens (see Appendix 6 - Commercial Response 1 & 2). We do not have a direct relationship with any kitchen manufacturer and expect you to negotiate your own prices with Howdens and another, being sure to allow for the supply in your basket rates. We assume you will engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works. Note: Two additional weeks have been added to the submission deadline to accommodate the expectation of there being an alternative set of pricing using any other 'non-Howdens' manufacturer for the Kitchens pricing element. No further extensions will be given. Programme scale and duration We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We estimate the value of the contract to be up to £6.5m over the max term of the contract. Geographical distribution Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire. Each year, our programme will consist of approximately 200-500 homes across our estate (depending on each year's agreed budget). Around 70% of our stock are within the Maidenhead area, however as above there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell. Programming We will leave programming of the work to you. We may have a small number of high-priority cases needing to be done earlier, but in general we would give you our address list for each financial year (April to March) and you can determine your own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day. CDM We will appoint the Quoin Consultancy as Principal Designer, you will be appointed Principal Contractor. We assume you will prepare the key documents and Quoin will check them against the regulations. Pricing model Works will be priced on basket rates per the attached specification and pricing matrix with variation on M3NHF SOR Version 7.0. As above, there is also a requirement to put forward an additional 'alternative bid' that features another brand (not Howdens). Pricing: All relevant pricing is to be submitted via the Pricing Matrix (Appendix 6) as all-inclusive (meaning they must include all aspects required to supply and install full kitchens and bathrooms). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract. Ordering and payment • Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices. • Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys. • You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract. Form of contract The form of contract will be the JCT Measured Term Contract (MTC2024) KPIs • Completed Works Programme • Install Timeframe • Resident Satisfaction • Using Agreed Pricing • Aftercare (Snagging) • Client Handover Pass Rate • Client Health & Safety • Documents & Compliance Certifications
Scope
- Reference
- KB2025
- Total value
- £5,200,000 excluding VAT£6,500,000 including VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 31 Mar 2026 to 31 Mar 2029Possible extension to 31 Mar 2031
Initial term of 3 years with a option to extend for two further 12 month periods (Max term 5 years).
- Main category
- works
- CPV classifications
- 391414004542115139144000444100004521131045211000
- Contract locations
- Berkshire, United KingdomSouth East England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 40% weighting has been assigned across 10 x Quality Questions (See ITT Document & Appendix 4B for more information) | quality | 40.00% |
| Price | 60% weighting has been assigned across 6 x Price Categories (See ITT Document & Appendix 6 for more information) | price | 60.00% |
Participation
Conditions suppliers must meet to bid.
The following Insurances will need to be in place in order for the contract to be awarded: Public Liability - £10m Employers Liability - £5m Professional Indemnity - £1m Requirement to adhere to GDPR Regulations. Draft JCT contract has been provided in attachments (Appendix 11). Financial Capacity will be tested. Please see attached ‘PSQ Economic & Financial Standing Mechanism’ + ‘PSQ Financial Standing Guide’ for how this will be assessed.
The PSQ contains the following Conditions of Participation (Pass/Fail): 1) Minimum installation experience (5yrs) 2) Requirement for Contractor (and any Sub-Contractor) to deliver all services under contract inline with Housing Solutions’ Approved Contractor Standards. 3) Integration with Housing Solutions’ job management system (Connect) 4) Relevant experience and contract examples. 5) Requirement to be able to deliver services across HS estate (predominantly Maidenhead) with local office/depot and mobilise quickly. 6) Requirement to have a Safeguarding Policy in place for Children & Vulnerable Adults. 7) Requirement to provide assurance on continuity of supply/service from your critical supply-chain (providing at least one of the following: a Business Continuity / Disaster Recovery / Risk Management Plan). 8) Requirement CDM Regulations adherence & SSIP Membership. 9) Requirement for 3rd party accreditation - Gas Safe and NICEIC (or equivalent). 10) Requirement Bribery Act adherence. 11) Modern Slavery Act adherence. 12) Requirement to Pass Conflict of Interest checks & Sign PSQ.
Submission & procedure
- Enquiry deadline
- 15 Aug 2025, 11:00 am
- Submission deadline
- 26 Aug 2025, 11:00 am
- Submission address
- https://www.mytenders.co.uk ↗
- Electronic submission
- Yes
- Procedure
- Open procedure