BBV Sublot 4 - HSST1020 - Curzon Wharf Phase 2 Contaminated Land Remediation

Balfour Beatty VINCI JV HS2contractContracts FinderRef C4N102960111SME suitableclosed
View buyer

Estimated value

£2.5m

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

20 Nov 2025

Deadline 01 Dec 2025

Description

A contaminated land remediation exercise is required at the Curzon Wharf site where LNAPL (Light Non Aqueous Phase Liquids) has been identified within a monitoring well. The exercise will comprise of at least two stages, with the first stage comprising dipping each of the five wells in the vicinity with oil/water interface dip meter to measure LNAPL thicknesses; sampling from the wells; laboratory testing for a speciated TPH and BTEX suite of analysis; followed by manual baling and disposal of any LNAPL. The second stage will comprise the open-hole excavation of the original well location to a depth of approximately 5.5m below ground level; the logging of the sidewalls and recording of any oil seepage into the excavation and the segregation and testing of gross contaminated soil followed by the verification sampling of the excavation base and sidewalls. A sump will be used to pump and collect LNAPL and contaminated water until the source is removed. A third stage of remediation within the scope of works may be required depending on the results of the first two stages of remediation. An options appraisal of remediation techniques will be required and may include the installation of additional remediation wells, further total fluids recovery, further excavation of contaminated soil and/or the installation of a chemical oxidation zone. A verification report will be required at the completion of the works.

Scope

Reference
C4N102960111
Total value
£2,500,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
30 Jun 2026 to 15 Oct 2026
CPV classifications
90522300
Particular suitability
Small and medium-sized enterprises (SME)