G4_2_HCC_044 Hartford Bridge Flats - Fourth Arm
Estimated value
£1.1m
Awarded value
£1.1m
Suppliers
1
Lots
1
Published
09 Jun 2023
Description
A call-off from Lot 1 of the Generation 4-TWO 2020-2024 Civil Engineering, Highways & Transportation Collaborative Framework (awarded 06 March 2020). The Works comprise of the realignment of Blackbushes Road to tie into the south side of the existing Hartford Bridge Flats roundabout on the A30. A new section of carriageway approximately 240m in length will be constructed between the roundabout and Blackbushes Road, with the redundant road being perforated and covered in site won topsoil, heathland shrub, and brash. A drainage ditch will be constructed adjacent to the new section of road and a security fence installed along the new highway boundary.
Scope
- Reference
- UN21264
- Total value
- £1,146,070 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 25 May 2023 to 04 Jul 2023
- CPV classifications
- 45230000
Submission & procedure
- Submission deadline
- 14 Apr 2023, 1:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.1m
Award date
21 May 2023
Contract start
25 May 2023
Contract end
04 Jul 2023