GB-Telford: Hollies Road Project 2018
Estimated value
£685k
Awarded value
£685k
Suppliers
1
Lots
1
Published
08 Aug 2018
Description
Telford and Wrekin Council Resurfacing 2018, Orleton lane and Hollies Road: Orleton Lane and Hollies Road run north to south to the West of Wellington. The project also includes two side roads named Steventon Road and Cranage Crescent which form a loop off Hollies Road. The roads are on average 5.5m wide with a total length of 1122m. The post code is TF1 2AA with the grid reference being (364485,311266) and (364444, 311913). The works comprise: •Carriageway resurfacing and associated road markings •Resurfacing of footways along with kerb replacement at parts. •Drainage improvements •Sign replacements (including elements of contractor design) In addition, the project will include resurfacing of a 260m long section of Spring Hill located north of Orleton Lane towards Morrison's roundabout with an average road width of 6.5m. Post code TF1 3HE with a grid reference of (364479, 311919). The works on this section will include: •Carriageway resurfacing and associated road markings •Drainage improvements
Scope
- Reference
- BIP338083400
- Total value
- £685,135 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 20 Aug 2018 to 14 Dec 2018
- CPV classifications
- 45233253 44912400 45233251 45233161 45233223 45233300
Submission & procedure
- Submission deadline
- 06 Aug 2018, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£685k
Award date
06 Aug 2018
Contract start
20 Aug 2018
Contract end
14 Dec 2018