TEC Partnership - Boiler Room Refurbishment - AWARD
Estimated value
—
Awarded value
£503k
Suppliers
1
Lots
1
Published
17 May 2024
Description
This specification describes the proposed refurbishment of the main central boiler room at the Grimsby Institute. The refurbishment works shall include the replacement of the existing pipework, pumps and controls within the boiler room, plus associated electrical works (power supplies, control wiring and containment). This scope of works shall also include the replacement of the existing feed and expansion tanks for the heating system, plus associated feed and vent pipework. The site installation works will be programmed over a period of 4 months, making use of the holiday periods for carrying out the most disruptive works. This specification is to be read in association with the mechanical services drawings and schematic layout. The Mechanical Services Contractor (MSC) is to include for all labour, supervision, and materials in order to carry out the complete installation as indicated on these drawings or included with this specification. Due to location of mains cables some of which are bitumen and paper wrapped and 1959 era mains swich gear a specification has been included for the Main plant room Electrical Switchgear and sub main replacement. This document will be part of the main project due to time scales and access.
Scope
- Reference
- IT-399-2888-TEC-BRR-24 - AWARD
- Commercial tool
- Standalone contract
- Contract dates
- 20 May 2024 to 30 Aug 2024
- CPV classifications
- 42160000 44621200 45331110 50531100
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 22 Apr 2024, 11:01 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£503k
Award date
16 May 2024
Contract start
20 May 2024
Contract end
30 Aug 2024