CUE & Butterfly House Decarbonisation

THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUSTcontractFind a TenderRef ocds-h6vhtk-066112Procurement Act 2023SME suitableVCSE suitableactive
View buyer

Estimated value

£900k

works

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

18 Mar 2026

Description

The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016 as glasshouse for tropical plants and butterflies. The Horniman wish to engage a Main Contractor who will manage and deliver the implementation of the decarbonisation of the above buildings in the listed setting. The works will be let on the basis of traditional JCT contract intermediate form without quantities, but with some contractor design elements. As part of the Horniman's Climate and Ecology Manifesto we have made a commitment to become Greenhouse Gas Neutral by 2040. The key objective of this project is to move us towards this goal by doing the following: • Butterfly House: Replacing the gas cabinet air heater with air-to-air Air Source Heat Pumps (ASHPs). • Butterfly House: Thermal performance and air tightness improvement by replacing existing glass and acrylic with triple layer polycarbonate cladding to existing steel structure with new aluminum glazing bars, window and vents. • Butterfly House: Thermal performance and carbon reduction by installation of new trench heating with new Air Handling Unit and visitor path surface or as an alternative an fan-coil system • CUE: Replacing the gas boiler in the Centre for Understanding the Environment (CUE) building with air-to-water Air Source Heat Pumps. • CUE: Improve the thermal performance and air tightness improvement by draught proofing and thermal bridge mitigation including floor, wall and roof new thermal insulation. • CUE: Install Mechanical Ventilation Heat Recovery (MVHR) • Upgrading the electrical cables inside both the Butterfly House and CUE building.

Scope

Reference
ocds-h6vhtk-066112
Total value
£900,000 excluding VAT
£1,080,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
03 Sept 2026 to 31 Mar 2028
Main category
works
CPV classifications
31200000
31600000
45000000
51100000
Contract locations
London, United Kingdom
Particular suitability
Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
PriceFor tender evaluation following initial Selection Questionnaire (SQ).price60.00%
QualityFor tender evaluation following initial Selection Questionnaire (SQ).quality40.00%

Participation

Conditions suppliers must meet to bid.

Responses to the financial checks and relevant experience questions are weighted at 50% each. The five top scoring Selection Questionnaire's will be selected to move onto the main tender process.

Submission & procedure

Enquiry deadline
05 Apr 2026, 10:59 pm
Submission address
Selection Questionnaire submissions should be made to Henry Stenning at hstenning@horniman.ac.uk and to Simon Hart at s.hart@prsarchitects.com https://www.horniman.ac.uk/
Electronic submission
Yes
Procedure
Competitive flexible procedure