COV - Data Centre Services
Estimated value
—
Awarded value
£549k
Suppliers
1
Lots
1
Published
19 Sept 2025
Description
The following is the general requirements are relevant for the successful delivery of this project/solution: • Replacement of compute and storage hardware that is out of support or going end of support in March 2026. The scope of kit is listed in Attachment 4- CCC SAN Replacement In Scope Kit List - June 2025 • Right sizing the environment such as cores, RAM, and storage. Rightsizing the VM's is not necessary and will be done where possible before any data is given as part of the tender. • The design should have the same hardware specifications at the two sites scoped for this project. The data at each site will need to be replicated to its partner site. The solution that is provided should allow the live services to be failed over to the non-production side in case of a DR scenario. The test/dev services at the DR site when DR is invoked will be powered down to allow all the live services to run.
Scope
- Reference
- COV - 22221
- Commercial tool
- Call-off from a framework
Submission & procedure
- Procedure
- Award under framework
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£549k
Award date
18 Sept 2025
Contract start
15 Mar 2026
Contract end
14 Mar 2031