RESETTING COBBLE STONES IN FRONT OF THE CHURCH AND ADJACENT TO THE PARISH ROOMS
Estimated value
£20k
Awarded value
—
Suppliers
0
Lots
1
Published
28 Mar 2019
Description
The cobbled area is used by parishioners and hirers of the Parish Rooms on a daily basis, and the cobbles require resetting along with the removal of old weeds and moss. The cobbles are required to be repointed to ensure safe passage across the area by users of the of the Church and Parish Rooms and indeed those within the Market Place. Cobbled Paving General Information Lift and relay in sections all the cobbled stones, total area approximately 156 m2. Before relaying a certain amount of sorting of the cobbles may be required to ensure consistency texture and dimensional tolerance. Remove all existing ballast to a depth suitable to form a new consolidated concrete sub-base and sand and cement bed or similar suitable for relaying the cobbles to withstand vehicles movements but not exceeding the height of the current level of cobbles.
Scope
- Reference
- Accessibility and Highways Cobbles Project
- Total value
- £20,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 31 Jul 2019 to 31 Aug 2019
- CPV classifications
- 45000000 50000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 13 May 2019, 11:00 pm