Transforming Imperial War Museums London: Level 4 Refurbishment Project Principal Contractor

IMPERIAL WAR MUSEUM TRADING COMPANY LIMITEDcontractContracts FinderRef IWM/TIWM/1889SME suitableclosed
View buyer

Estimated value

£400k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

23 Mar 2018

Deadline 19 Apr 2018

Description

The project is to refurbish the existing office spaces on Level 4 and create a new humidity controlled secure object store and picture conservation work space. The works comprise of but is not limited to the following :- Level 4 Demolition of existing fixtures and fittings and removal of existing furniture, ceilings, walls, mechanical and electrical infrastructure. The construction of new walls, floor finishes, doors, wall linings, window refurbishment works, new sections of ceiling, new electrical small power and lighting, new ductwork, fire stopping works and data infrastructure. Decorations to existing walls and floors and the adaptation of the existing heating infrastructure. Roof plant room Demolition of all existing mechanical plant, ductwork, grills and mechanical infrastructure. The construction of two new mechanical systems including the installation of new ductwork, forming new openings for new grills in an existing brick wall, forming new openings in an existing brick wall for ductwork to pass through existing wall to adjacent room, installation of one new Air Handling Unit, amendments to electrical infrastructure, fire stopping works, installation of a new BMS panel and amendments to the existing Chilled Water and LTHW infrastructure via new pipe work on the roof.

Scope

Reference
IWM/TIWM/1889
Total value
£400,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
03 Jun 2018 to 06 Sept 2018
CPV classifications
45000000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
19 Apr 2018, 11:00 pm