Transforming Imperial War Museums London: Level 4 Refurbishment Project Principal Contractor
Estimated value
£400k
Awarded value
—
Suppliers
0
Lots
1
Published
23 Mar 2018
Description
The project is to refurbish the existing office spaces on Level 4 and create a new humidity controlled secure object store and picture conservation work space. The works comprise of but is not limited to the following :- Level 4 Demolition of existing fixtures and fittings and removal of existing furniture, ceilings, walls, mechanical and electrical infrastructure. The construction of new walls, floor finishes, doors, wall linings, window refurbishment works, new sections of ceiling, new electrical small power and lighting, new ductwork, fire stopping works and data infrastructure. Decorations to existing walls and floors and the adaptation of the existing heating infrastructure. Roof plant room Demolition of all existing mechanical plant, ductwork, grills and mechanical infrastructure. The construction of two new mechanical systems including the installation of new ductwork, forming new openings for new grills in an existing brick wall, forming new openings in an existing brick wall for ductwork to pass through existing wall to adjacent room, installation of one new Air Handling Unit, amendments to electrical infrastructure, fire stopping works, installation of a new BMS panel and amendments to the existing Chilled Water and LTHW infrastructure via new pipe work on the roof.
Scope
- Reference
- IWM/TIWM/1889
- Total value
- £400,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 03 Jun 2018 to 06 Sept 2018
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 19 Apr 2018, 11:00 pm