Boxbay Enabling Civil Works

LONDON GATEWAY PORT LIMITEDcontractFind a TenderRef ocds-h6vhtk-060dd2Procurement Act 2023Utilities regimeactive
View buyer

Estimated value

£4.5m

works

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

23 Jan 2026

Description

The enabling works consist of the installation of new below ground utility ducting; new fire water pipework; new fire hydrants; and new drainage pipework along with associated access chambers. Additionally, existing electrical services and equipment will be diverted/relocated including an existing feeder pillar; an electric vehicle charger; supplies for existing yard lighting; and other small power supply requirements. To facilitate this, demolition and removal of existing yard areas will be required; excavation for the installation of the above services; and the reinstatement of new yard finishes. It is intended that the enabling works commence in April 2026 for a duration of 3 months. Civil works required include: • Installation of new utility ducting and chambers • Removal/diversion of existing electrical supplies including feeder pillars, EV charger etc. • Installation of HV cabling • Installation of Earthworks and heavy duty pavement • Installation of new surface water drainage pipework • Installation of new fire hydrants and pipework

Scope

Reference
ocds-h6vhtk-060dd2
Total value
£4,500,000 excluding VAT
£5,400,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
31 Mar 2026 to 01 Jul 2026
Main category
works
CPV classifications
45000000
Contract locations
Thurrock, United Kingdom

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Commercialcost60.00%
Technicalquality40.00%

Participation

Conditions suppliers must meet to bid.

As per PQQ documents to be shared on Oracle

Submission & procedure

Enquiry deadline
23 Feb 2026, 12:00 pm
Submission address
https://ehpv.login.em2.oraclecloud.com/
Electronic submission
Yes
Procedure
Competitive flexible procedure