S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
Estimated value
£100k
Awarded value
£100k
Suppliers
1
Lots
1
Published
06 Aug 2026
Description
National Highways Strategic Safety Team in the Road Safety Division want to procure through the SPaTS 3 framework a Direct Award to WSP for the continued development of Lead Safety Indicators (LSIs) project (T0631) through a re validating and verification stage. In the National Highways 2024-25 annual delivery plan we committed to developing a set of LSIs. ORR is following progress on this. It is understood that DfT is expecting at least one lead safety indicator (in addition to the existing iRAP metric) to be added to our formal organisational performance metrics during RIS3. National Highways' key performance indicator for road user safety on the Strategic Road Network (SRN) (KPI1) is a lagging indicator, focused on impacts. A lagging indicator is reactive in nature and measures the performance of an aspiration or outcome after an event has occurred. They don't tell us how we're performing at preventing casualties and reducing future collision severity. There is also a time lag of knowing the results of a lagging indicator, for example, 2024 stats 19 data was published on 25 September 2025. Although measurable and quantifiable, lagging indicators alone are not enough, and they don't provide insight into factors that lead to those outcomes without in-depth analysis. LSIs are proactive, preventive measures (or metrics) used to shed light on the level of safety performance achieved in a system through monitoring and intervention. A lead indicator attempts to measure control and preventative activities that precede or indicate likely failures. They are designed to understand what is happening earlier in the process in order to prevent and control lagging indicators. Therefore, to improve road safety on the SRN (and reduce KSIs), there is a need to identify, monitor and positively influence LSIs. Our iRAP performance indicator (percentage of traffic using iRAP 3 star or above rated roads, and flow-weighted decimal star rating) is a lead indicator, but as we are only able to conduct a full survey once every 5 years, we need additional measures that can provide earlier and more frequent indication of safety performance and therefore any need for change in approach or additional intervention within the 5 year period.
Scope
- Reference
- tender_537735/1600509
- Total value
- £100,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 02 Aug 2026 to 30 Mar 2027
- CPV classifications
- 73220000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 15 Jun 2026, 6:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£100k
Award date
02 Aug 2026
Contract start
02 Aug 2026
Contract end
30 Mar 2027
Awarded suppliers· 1 supplier
Awarded 02 Aug 2026 · Contract period 02 Aug 2026 — 30 Mar 2027
Other contracts from National Highways
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to WSP UK LTD· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Test borehole drilling and analysis | contract | £657k | 04 Aug 2026 |
| M&E Engineer Led Design Team for PSDS and HV/LV | contract | £1.6m | 04 Aug 2026 |
| Contract Award Notice - THMS_MMF_Thames Modelling Package 25-26 | contract | £261k | 04 Aug 2026 |
| Harwell Groundwater Treatment Plant Post Closure Monitoring | contract | £299k | 27 Jul 2026 |
| Main Works EIA Scoping Report | contract | £34k | 27 Jul 2026 |
| C34715 Selby Depot Test Fit | contract | £23k | 15 Jul 2026 |
| Professional Services Contract PSC For EMM | contract | £200k | 09 Jul 2026 |
| Contract Award Notice - Landfill Gas to Electricity, Cost Commission | contract | £60k | 19 Jun 2026 |
| Provision of Human Factors & Ergonomics Call-off Contract Created | contract | £3.0m | 17 Jun 2026 |
| Sustainability Framework | contract | — | 16 Jun 2026 |