Milford Haven Public Transport Interchange
Estimated value
—
Awarded value
£7.3m
Suppliers
1
Lots
1
Published
19 Mar 2026
Description
The Milford Haven Public Transport Interchange (MHPTI) scheme involves improvement works to the existing Milford Haven train station to create a new public transport interchange. This requires the relocation of the existing rail platform to allow for the provision of a new bus interchange, taxi rank, formalised car park, public realm spaces and improved Active Travel links. The platform relocation will also enable intercity services to and from London to use the station, in line with the Council’s and Transport for Wales’s long-term ambition to provide more regular rail services and better connectivity to more destinations. he works include: • Provide a public transport interchange including a bus focal point and coach pick-up / drop-off point connected to the station • Provide an improved railway station • Improve passenger amenities, facilities and security at the station • Provision of a new car park with Electric Vehicle charging facility and taxi rank • Improved built environment of station from a visual and landscape perspective • Improve accessibility to transport facilities and the town core areas • Improve Active Travel connectivity to the public transport interchange • Create sustainable access links within and between the town core areas. • Futureproof the railway by increasing patronage and supporting an enhanced railway service to Milford Haven (i.e. the London rail service) • Connect Local Communities • Limit the amount of environmental damage and emission from private vehicle usage, creating a greener way to travel.
Scope
- Reference
- PROC/2526/098
- Commercial tool
- Standalone contract
- Contract dates
- 26 Mar 2026 to 31 Jul 2027
- CPV classifications
- 45213321
- Contract locations
- Wales, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Technical | Methodology, Programme, H&S, Community Benefits etc | quality | — |
| Commercial | ECC Target Cost (50%) ECC Fee Percentage (10%) Target Cost with Activity Schedule and Contract Data Part 2. ECC Target Cost to be exclusive of Fee | cost | — |
Participation
Conditions suppliers must meet to bid.
As per tender documentation - includes satisfactory financial assessment including D & B Assessment and acid test ratio.
Network Rail awarded Principal Contractors Licence Certificate and RISQS Certification.
3 Case studies/capability statements, Health, Safety, Quality and Environment information in relation to the supply chain, Sustainability, Network Rail Principal Contractors Licence and RISQS certification.
Submission & procedure
- Procedure
- Competitive flexible procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£7.3m
Award date
19 Mar 2026
Contract start
30 Mar 2026
Contract end
31 Jul 2027
Awarded suppliers· 1 supplier
Awarded 19 Mar 2026 · Contract period 30 Mar 2026 — 31 Jul 2027
Other contracts from Pembrokeshire County Council
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to Balfour Beatty Rail Limited · 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Milford Haven Public Transport Interchange | contract | — | 27 May 2026 |
| Network Rail High Speed - Operation and Maintenance of Rail Plant | contract | — | 11 Dec 2025 |
| Operation and Maintenance of Network Rail's Seasonal Fleet | contract | — | 02 May 2025 |
| On Track Drain Remediation Services | contract | — | 25 Apr 2025 |
| W&W Reactive & Minor Works (RMW) Framework | contract | — | 02 Apr 2025 |
| #35080 - Provision of Tamper and Regulator Services | contract | — | 31 Mar 2025 |
| Meridian Water Rail Project | contract | — | 01 Jun 2023 |
| Wessex Works Delivery Track Framework | contract | — | 23 Aug 2022 |
| PLU HV Power Framework - Call-off - Batch A | contract | — | 10 Aug 2022 |
| Earthing and Bonding | contract | — | 28 Jul 2022 |