Waste Collection and Disposal Services
Estimated value
—
Awarded value
—
Suppliers
0
Lots
6
Published
10 Sept 2024
Description
Abri are seeking the provision of suitably experienced and accredited contractor(s) to manage all aspects of waste collection and disposal from various sites across Abri's current and growing geography. This is to include but not be limited to; provision of the waste receptacles, regular collections and transportation of the waste to recycling / disposal and reporting provisions. The following waste streams are available under this Tender, each waste stream will form its own Lot will constitute individual contracts and include: 1. General trade waste & Recycling waste (including Green Waste) 2. Complex waste (Weee, Hazardous Waste, POPS, White goods, etc) 3. Removal, Storage, return/disposal of community items 4. Ad-Hoc skip usage for construction sites. 5. Complete Waste Managed Service 6. Known Valuable Waste and Metals Abri reserve the right to award any, all, or none of the above Lots, as non-exhaustive examples Abri may choose to award Lots 1,2,3,4 and not Lot 5, or just Lot 5 and no other. It is unlikely that Abri will award Lots 1,2,3,4 aside Lot 5 in the event Lot 5 is awarded due to the conflicting areas of coverage. We expect that
Scope
- Reference
- P/ABRI 0870/2022
- Commercial tool
- Standalone contract
- Contract dates
There is a possible 60 months of extensions available on the contract. These extensions can be broken down into smaller 12month periods.
- Main category
- services
- CPV classifications
- 90500000
- Contract locations
- UK
Submission & procedure
- Submission deadline
- 18 Oct 2024, 11:00 am
- Submission address
- https://www.in-tendhost.co.uk/abri/aspx/Home ↗
- Procedure
- Open procedure
Lots · 6 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | General trade waste & Recycling waste (including Green Waste) | — | active |
| 2 | 2. Complex waste (Weee, Hazardous Waste, POPS, White goods, etc) | — | active |
| 3 | 3. Removal, Storage, return/disposal of community items | — | active |
| 4 | 4. Ad-Hoc skip usage for construction sites | — | active |
| 5 | 5. Complete Waste Managed Service | — | active |