SBIM Surfacing

AMEY OW LIMITEDcontractContracts FinderRef SBIM 1SME suitableclosed
View buyer

Estimated value

£1.5m

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

15 Apr 2024

Deadline 01 May 2024

Description

With continuing deterioration and repairs of the existing surfacing, a task order was issued in 2023 for a detail design of the resurfacing of the Prince of Wales (M4) Cable Stay section of the bridge by National Highways. This is intended as the first phase of the works, with the resurfacing of the Gwent and Avon Viaduct likely to follow suit. The works to include the removal of the existing surfacing, binder course and waterproofing layer of all three lanes up to the edge of the drainage systems within the hard shoulder. This should allow for the proposed waterproofing layer to be 'lapped' in the hard shoulder before reinstatement of the new binder and surfacing layer. Full resurfacing of Cable Stay Bridge including traffic management, any concrete repairs and waterproofing. Works are further detailed within the attached scope and specification documents. AMEY is seeking bids from qualified Suppliers for the delivery of Surfacing activities on the SBIM project (Severn Bridge) Bids should be in accordance with the details, terms and conditions, documents detailed herein.

Scope

Reference
SBIM 1
Total value
£1,500,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
12 Jul 2024 to 05 Dec 2024
CPV classifications
45233223
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
01 May 2024, 5:00 pm