Hull Construction Feasibility Study

WAVE-TRICITY LTDcontractContracts FinderRef Hull Construction Feasibility StudySME suitablewithdrawn
View buyer

Estimated value

£1

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

10 Jun 2019

Deadline 09 Jun 2019

Description

Wave-Tricity Ltd intends to construct a full-scale concrete hybrid generation platform, which will be a large and complex build. The platform hull will be a multi-decked ship-shaped barge with superstructure circa 100m x 25m x 10m and will be constructed from marine grade concrete. There are several construction methodologies available to build this type of structure, each with varying advantages and disadvantages with respect to the design of the platform hull. The requirement is to conduct a construction feasibility study to provide the Wave-Tricity Ltd design team with a recommended construction methodology prior to starting detailed engineering. This will minimise design risk and cost during the next phase of works and allow for early engagement with potential fabrication sites for the platform

Scope

Reference
Hull Construction Feasibility Study
Total value
£1 excluding VAT
Commercial tool
Standalone contract
Contract dates
16 Jun 2019 to 19 Sept 2019
CPV classifications
45244000 71000000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
09 Jun 2019, 11:00 pm