Hull Construction Feasibility Study
Estimated value
£1
Awarded value
—
Suppliers
0
Lots
1
Published
10 Jun 2019
Description
Wave-Tricity Ltd intends to construct a full-scale concrete hybrid generation platform, which will be a large and complex build. The platform hull will be a multi-decked ship-shaped barge with superstructure circa 100m x 25m x 10m and will be constructed from marine grade concrete. There are several construction methodologies available to build this type of structure, each with varying advantages and disadvantages with respect to the design of the platform hull. The requirement is to conduct a construction feasibility study to provide the Wave-Tricity Ltd design team with a recommended construction methodology prior to starting detailed engineering. This will minimise design risk and cost during the next phase of works and allow for early engagement with potential fabrication sites for the platform
Scope
- Reference
- Hull Construction Feasibility Study
- Total value
- £1 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 16 Jun 2019 to 19 Sept 2019
- CPV classifications
- 45244000 71000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 09 Jun 2019, 11:00 pm