DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

CPD - Construction DivisioncontractFind a TenderRef ocds-h6vhtk-02889c32014L0024active
View buyer

Estimated value

works

Awarded value

Suppliers

1

1 SME

Lots

1

1 awarded

Published

09 Mar 2022

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Scope

Reference
ocds-h6vhtk-02889c
Commercial tool
Standalone contract
Main category
works
CPV classifications
45240000
45262211
Contract locations
Northern Ireland

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality30quality
70price

Submission & procedure

Procedure
Restricted procedure

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end

Awarded to