DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
09 Mar 2022
Description
The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.
Scope
- Reference
- ocds-h6vhtk-02889c
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 4524000045262211
- Contract locations
- Northern Ireland
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 30 | quality | — |
| — | 70 | price | — |
Submission & procedure
- Procedure
- Restricted procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—