Conduit Lane Drainage Works
Estimated value
£7k
Awarded value
£7k
Suppliers
1
Lots
1
Published
13 Dec 2019
Description
Drainage Installation To attend site on a one off basis during normal working hours to: Erect 1no tower scaffolding into place. Locate gully behind wall. Stitch drill brickwork out. Core 1no 5" hole into gully. Supply and install 100mm cast pipework into gully. Run down outside of wall. Supply and install rod eye. Fix pipework to wall. Break out around inspection chamber at bottom. Supply and install pipework and 1no sweeping bend. Connect into inspection chamber. Concrete around top. Supply and install new brickwork around pipework. Point in brickwork and around pipework. All debris to be removed from site. Site to be left clean and tidy. Concrete around top. Supply and install new brickwork around pipework. Point in brickwork and around pipework. All debris to be removed from site. Site to be left clean and tidy. Surface Drain Cleaning Attend the above site on a one off basis, during normal working hours with a DTX towable jetter x leader hose, 2 stage ladder and a suction tanker to: Clean and descale surface drain from the rodding eye in the wall on the Western Abutment through to the soakaway Adjacent to the Metal & Waste Recycling Yard Clean and clear the down from the high level channel through to the soakaway whilst sucking out the soakaway Clean keyholes and top of the manhole covers Leave area in a clean and fully operational condition
Scope
- Reference
- ENFLD001-DN452632-78178581
- Total value
- £6,500 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 07 Jan 2020 to 31 Jan 2020
- CPV classifications
- 44000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 12 Dec 2019, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£7k
Award date
13 Dec 2019
Contract start
07 Jan 2020
Contract end
31 Jan 2020